Gallery
choosing Stratos Group, you are innovating every day
In this area you will find some of our projects, you can get to know us and see how we work. We cannot add all our work because some clients make us sign confidentiality of their IT infrastructure and we do not have permission to upload before and after photos of their projects. .
In this project we supported our client in the installation of a Starlink antenna to support their Internet connection.
We installed a radio link to connect the solar panel and camera solution that needs to be located in an area where they do not have electricity.
We installed a solar panel and a ubiquiti camera solution connected to a solarpoint charger to keep the security cameras charged.
The client contacts us to run the network cabling and support him in solving the problem of some network outlet.
Miniso contacted us again from California to help them run a cable to connect the front desk with their network in the storage and resolve problems in their network.
RAM construction contacted us again to support them in the telephone and network wiring run.
In this project, the construction company RAM contacted us to support them in the coaxial cable pre-wiring of several apartments that they were rebuilding. We visited them during construction to support them in making the best decision. It was a very fluid job because the project manager was very consistent with our ideas.
In this project, 18 network points were run between cameras, data and telephone, a Ubiquiti access point was placed for the Wi-Fi zone, we placed an alarm system with 2 motion sensors and 2 door sensors, we placed a rack to organize the telecom room and had more security and we supported the client with problems he had with the telephone lines that Comcast was assigning him.
This small business contacted us to support them in the installation of the security cameras, but the difficult thing is that we had to work without them to stop operations, Mr. Joseph was satisfied with our work and gave us an excellent review.
This project we were contacted by the company Savino del Bene to carry out the organization and wiring of new network points, the problem in this project was that they could not stop operations because they are a logistics company, it was a little complicated because they had to working hot and we had to be disconnecting and connecting network points, another problem was that if we connected the network cable to a wrong port, the port would be blocked and we had to contact the central office in New York to solve it.
We finished this project with 0 complications, the network ports were never blocked, the workstations were online without complications and the infrastructure manager was satisfied with this work.
The client contacted us from Turkey to support him in security for a small business in Houston, we installed 4 cameras, alarm system, remote access control for the doors, motion sensors and a Wi-Fi network.
In this project, Vault Ventures contacted us from the state of Florida, because they needed to update the security camera system of a storage unit they were purchasing in Houston, they needed motion detection alarms and to be able to monitor everything from their headquarters.
We offered them cameras with floating lights, alarm, 2 way audio, some PTZ cameras with automatic zoom so they could control and monitor everything from their headquarters in Florida, we used radio link technology to reduce structured cabling costs; Shielded Cat 6 UTP cable was used to protect the equipment from any electrical storm or electric shock.
The general company Noli contacted us to carry out the data and voice cable run in their new office in Houston. They also asked us to help them with the organization and setup of all the office devices.
In this project Miniso contacted us to support them in connecting the reception with the network they have in the warehouse, because they had many problems connecting via Wi-Fi, we run the cable, then we detected that they had network conflicts between 3 routers, which they had connected in the network, we carried out the diagnosis and solution of the problem so that all the devices could work on the same network, they were left with a 100% problem-free network.
General Noli contacts us again to support them in their new headquarters in Atlanta to run the data and voice cables, organize the office rack.
When we were in Atlanta, they asked us for support to assemble the cubicles and organize all the wiring.